„Odra Queen” is ready to sail

22 czerwca 2018

In the middle of June 2018, EPA Marine completed renovation work on the river passenger ship „Odra Queen” owned by Polsteam Żegluga Szczecińska.

The scope of work included the design and construction of the bridge console, assembly of steering and engine controls, delivery of navigational and radio-communication equipment. We installed a new public address, PA/GA system together with loudspeaker lines. In addition, a CCTV monitoring system watching the important areas of the ship was installed. Despite of the inconvenience resulting from the accumulation of renovation works on the small size of the bridge and almost tropical weather inside and outside, the works were completed within time specified by the Owner.

Odra Queen bridge consoleOdra Queen Console